Warren
Environmental, Inc.
1-888-5WARREN (888-592-7736)
Non Toxic Restoration Systems

Clients & Projects

  • Town of Marblehead, MA Water & Sewer Commission
  • Anheuser-Busch Co – St. Louis, MO
  • City of Owensborough - Owensborough, KY
  • City of Medford - Medford, MA
  • City of Jackson - Jackson, MS
  • Polaroid - Waltham, MA
  • East Snapfinger Rd Basin – DeKalb, GA
  • Kodak Colorado – Colorado
  • Kodak Park – Rochester, NY
  • Jefferson County Sewer Restoration – Birmingham, AL
  • New Croton Aquaduct – New York City D.E.P.

Tunnel Before

Tunnel After

Finished Manhole

Waste Treatment Plant

Aquaduct

Settling Tank


Installation Date - (1993)

Quantity
(Size, Diameter, Length)
Re-Coated structural steel with 100% solid epoxy - (Inspected in 2001 - in good condition)
Location Anheuser-Busch Co.
Merrimack, NH
Client/Contact Person Jim Trainor, Anheuser-Busch
221 Daniel Webster Highway
Merrimack, NH 03054
(603) 889-6631
Total Construction Cost $1,000,000.00
Years in Service 8 Years

Installation Date - (1994-2001)

Quantity
(Size, Diameter, Length)
The WES system was the only one of six products tested to pass the 5-year study in DeKalb County, GA 600 manholes were tested
Location East Snapfinger Rd. Basin
DeKalb, GA
Client/Contact Person Rick Daniels, DeKalb County
1580 Roadhaven Drive
Stone Mountain, GA 30083
(770) 621-7200
Total Construction Cost to date - $1,000,000.00
**$2.0 million in progress
Years in Service In Progress

Installation Date - (1995)

Quantity
(Size, Diameter, Length)
The WES system successfully repaired 4 pump stations subject to extreme H2S and I/I problems where the Raven Lining and Quadex System had previously failed
Location City of Sarasota Lift Stations
Sarasota, FL
Client/Contact Person Rick Ray
City of Sarasota Public Works
1750 12th St.
Sarsota,Fl. 34236
(941) 955-2325
Total Construction Cost $190,000.00
Years in Service 6 years

Installation Date - (1995)

Quantity
(Size, Diameter, Length)
The WES system was installed in sanitary manholes
Location Town of Marblehead
Water & Sewer Commission
Marblehead, MA
Client/Contact Person Dana Snow, Town of Marblehead
Water & Sewer Commission
P.O. Box 1108, Marblehead, MA 01945
(781) 631-2694
Total Construction Cost $136,000.00
Years in Service 6 years

Installation Date - (1997)

Quantity
(Size, Diameter, Length)
The WES system, in a paid competition, successfully lined 200' of 60" tunnel in low flow conditions, and 2 large under-ground siphon stations. The competitive product provided by Linabond was completely destroyed in this study by infiltration problems and H2S attack. At the end of the two year study, the WES system was in like new condition.
Location Miami-Dade Sewer Project
Miami-Dade County, FL
Client/Contact Person Pat Murray
(formerly with Rust Environmental)
1020 N. Broadway, Suite G-12
Milwaukee, WI 53202
(414) 270-4208
Total Construction Cost $180,000.00
Years in Service 4 years

Installation Date - (1997-2000)

Quantity
(Size, Diameter, Length)
The WES system was installed in manholes and digesters and E.Q. tanks
Location Anheuser-Busch Co.
Baldwinsville, NY
Client/Contact Person Robert Jasper - Anheuser Busch
2885 Belguim Road
Baldwinsville, NY 13027
(315) 635-8610
Total Construction Cost $400,000.00
Years in Service 4 years

Installation Date - (1997-2001)

Quantity
(Size, Diameter, Length)
The WES system successfully coated, over a 4 year period, 150 manholes, 1 wastewater treatment plan, and 4 pump stations in Owensboro, KY, and was recently chosen to repair and replace a failed system of Raven Lining's ultrahibuild system that was destroyed in a low PH environment
Location Manhole Restoration Project
Owensboro, KY
Client/Contact Person Mr. Dean Behnke
City of Owensboro, KY
Regional Water Resource
2101 Grimes Avenue
Owensboro, KY 42303
(270) 687-8459
Total Construction Cost $300,000.00
Years in Service 4 years

Installation Date - (1997)

Quantity
(Size, Diameter, Length)
The WES system was installed in sanitary manholes.
Location Kodak Park, CO
Client/Contact Person Tim McCarthy
Eastman Kodak
Windsor, CO
(757) 879-3641
Total Construction Cost
Years in Service 4 years

Installation Date - (1997-Present)

Quantity
(Size, Diameter, Length)
The WES system has restored over 4,500 manholes in Jefferson Cnty, AL, and is one of only two restoration processes approved in Jefferson County, AL
Location Jefferson Cnty Sewer Restoration
Birmingham, AL
Client/Contact Person Mr. John Wanhatalo, Hailey-Rast
2901 Shannon-Oxmoor Rd.
Birmingham, AL 35201
(205) 942-6888
Total Construction Cost $3.2 million to date
**$1.5 million in progress
Years in Service In Progress

Installation Date - (1998)

Quantity
(Size, Diameter, Length)
The WES system was installed in wastewater treatment plant biofilters
Location Mandarin Wastewater Treatment Plant
Jacksonville, FL
Client/Contact Person Nolan Hake
Danis Construction
(904) 260-1976
Total Construction Cost $541,830.00
Years in Service 3 years

Installation Date - (1999)

Quantity
(Size, Diameter, Length)
The WES system was installed in crosspassages of the subway.
Location Metro Red Line
North Hollywood, CA
Client/Contact Person Al Watson
R.A. Watson Company
506 Main Street
ElSegundo, CA 90245
Total Construction Cost $400,000.00
Years in Service 3 years

Installation Date - (1999)

Quantity
(Size, Diameter, Length)
The WES system successfully restored complete sewage treatment plant lift stations, digesters, and equilization basins where a previously installed system by TNEMEC had failed in a low PH environment
Location Sewer Treatment Plant Upgrade
Anheuser-Busch Co.
Cartersville, GA
Client/Contact Person Bill Kutosky, Anheuser-Busch Co.
1 Busch Place
2816 South 3rd Street
St. Louis, MO 63118
(314) 577-2916
Total Construction Cost $2,000,000.00
Years in Service 2 years

Installation Date - (2001)

Quantity
(Size, Diameter, Length)
Complete restoration of equilization basins, grit chambers and sludge blend tanks (all holding vessells in the plant)
Location Wast Water Treatment Plant #1
Newport, RI
Client/Contact Person Mr. Brian Corbett, Earth Tech
250 Connell Highway
Newport, RI
(401) 849-2637
Total Construction Cost $1,400,000.00
Years in Service In Progress